200 MSFCD GATHERING STATION
OAKLAND TOWNSHIP, PA
This full EPCM project expanded the facility capacity from 200MMSCFD to 400MMSCFD.
The facility consisted of:
-
10,200 HP compression
-
Dehydration
-
Pig launcher and receiver
-
Separators (two and three phase)
-
Generator and building
-
Instrument air and building
-
Fuel gas conditioner utilizing membrane technology
-
Incinerator
-
Blow down silencer
-
Storage tanks for condensate
​
The following support services and notable contributions were performed:
-
Environmental permitting and maintenance
-
Building design for weather and noise reduction
-
Road-building and road maintenance
-
Electrical layout design including switch gear and lighting
-
Project was completed 4 months early and $1.5M under budget